Project 1
Project Name: Lagunitas Brewery
Address: 1280 N. McDowell Ave Petaluma, CA 94954
General: Westcoast Solar Energy/Empire Earthworks
Owner: Lagunitas Brewing Company
Description of work: Install three separate photovoltaic solar systems total of 2,100 KW
Date and Duration: 11/2016-2/2019
Pipe Information: Packages consist of 6-2″ and 4-4″ conduits for electrical service at FARM ground mount
Other: Provided full turnkey boring and electrical service for two roof mount, and one ground mount solar array
Valuation: $4,672,042
Project 2
Project Name: Siemans Corporation
Address: Yuba City, Woodland
General: Westcoast Solar Energy
Owner: County of Sutter, County of Yolo
Description of work: Layout solar arrays. Excavate foundations, set flagpoles and pour concrete. Complete PGE sub-structure
Date and Duration: 6/1/18 – 10/1/18
Pipe Information: Packages consist of 6-2″ and 4-4″ conduits for electrical service at FARM ground mount
Other: Combined system size of 2MW.
Valuation: $275,000
Project 3
Project Name: Vandoorn – Private Residence
Address: 3605 Wood Valley Rd Sonoma, CA
General: Empire Earthworks
Owner: J. Vandoorn
Description of work: Provide electrical, telecom and water service from street to residence
Date and Duration: 8/12/19 – Present
Other: Bore and pull conduit for multiple services including 1-700′ rock bore and 1-400′
creek crossing. Provide turnkey electrical and telecom service to residence from public
utility
Valuation: $179,943
Project 4
Project Name: Neely – Private Residence
Address: 555 Portola Rd Portola Valley, CA 94028
General: Westcoast Solar Energy/Empire Earthworks
Owner: Spring Ridge, LLC
Description of work: Complete installation of turnkey power system
Date and Duration: 11/17-2/2018
Other: Design/Build complete off-grid power system including PV solar, 100kwh battery bank and diesel generator set
Valuation: $257,673
Project 5
Project Name: Meritronics
Address: 500 Yosemite Drive #108, Milpitas CA
General: Avalon Battery Corp Owner: Mertronics Corporation
Description of work: Complete installation of batteries, disconnects, conduit, cable, and DAS system
Date and Duration: 7/31/19-8/16/19
Pipe Information: N/A
Other: Fasten batteries, core holes in concrete and excavate, fixture bollards and pour concrete, build DAS box, mount AC disconnect, DAS box, DC disconnect, inverter end and install conduit system for power and data. Pull and terminate cable for power and data. Install PC breaker, terminate, install cable, assemble relay enclosures, install relay devices, pull cabling, and complete cabling terminations to complete functionality of relay enclosure, configure relay devices.
Valuation: $56,500